Close Menu
TMC PalauTMC Palau
  • Home
  • Palau News
  • Pacific Islands
  • Regional Politics
  • Regional Sports
  • Development & Policy

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Title shift raises fresh questions – FBC News

July 29, 2026

Transformation of Montjuïc’s exhibition grounds gets under way | Info Barcelona

July 29, 2026

Ministry refutes CWM lab shutdown speculations – FBC News

July 29, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
TMC PalauTMC Palau
Subscribe
  • Home
  • Palau News
  • Pacific Islands
  • Regional Politics
  • Regional Sports
  • Development & Policy
TMC PalauTMC Palau
Home»Palau News»Transformation of Montjuïc’s exhibition grounds gets under way | Info Barcelona
Palau News

Transformation of Montjuïc’s exhibition grounds gets under way | Info Barcelona

TMC PalauBy TMC PalauJuly 29, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email


A 200-tonne crane with a reach of up to 60 metres is carrying out the demolition of Palau 4 and the current Palau de Congressos. The rubble will be recycled on site for the construction of the new multifunctional palace, designed by Smiljan Radić (recently awarded the Pritzker Architecture Prize) together with Miquel Mariné Núñez, Beatriz Borque and César Rueda Bonet.

The 20,500 m² complex will be arranged over two floors and built around a lightweight metal structure that opens up the façades and ties the building more closely into its surroundings. The scheme also includes a landscaped walkway along the Avinguda de la Reina Maria Cristina frontage.

The new Palau de Congressos and Palau del Vestit

Work is also under way on the current Palau Alfons XIII, where the original structure designed by Josep Puig i Cadafalch will be preserved as the building is converted into Barcelona’s new Palau de Congressos. Designed by Forgas Arquitectes, Archambac (Arquitectura Sideral) and Álvaro Alejandro Fernández, the scheme includes a new entrance from Plaça de Carles Buïgas, a 6,670 m² garden courtyard and a 2,025-seat auditorium.

The former Palau del Vestit, meanwhile, will become home to a new innovation and business hub linked to the trade fair. Designed by Bjarke Ingels Group and MIAS Arquitectura, the project retains the colonnade and front façade on Plaça d’Espanya designed by Josep Maria Jujol. The result will be a flexible, three-storey, Z-shaped building set within landscaped grounds open to the public, incorporating a multi-purpose community facility that will add to the stock of neighbourhood spaces in Font de la Guatlla and Hostafrancs.

The new multifunctional pavilion and the refurbishment of the Palau Alfons XIII represent a combined investment of €250 million, while the redevelopment of the Palau del Vestit accounts for a further €40 million.

Once these three buildings are finished, a second phase will begin in 2029, covering the renovation of the Palau de les Comunicacions (Palau 1) and the Palau de la Metal·lúrgia (Palau 8). The whole programme is due for completion in 2035, with trade fair activity at Montjuïc continuing uninterrupted throughout.



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
TMC Palau

Related Posts

The controversial Katharina Wagner presents an “exceptional” tour that will start in Barcelona

July 28, 2026

Senator Schatz introduces bill to expand U.S diplomatic footprint in Pacific Island nations

July 28, 2026

Your browser is not supported

July 28, 2026
Leave A Reply Cancel Reply

Demo
Our Picks

Putin Says Western Sanctions are Akin to Declaration of War

January 9, 2020

Investors Jump into Commodities While Keeping Eye on Recession Risk

January 8, 2020

Marquez Explains Lack of Confidence During Qatar GP Race

January 7, 2020

There’s No Bigger Prospect in World Football Than Pedri

January 6, 2020
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Don't Miss

Title shift raises fresh questions – FBC News

Pacific Islands July 29, 2026

Sun Insurance has described Mohammed Nouzab Fareed as a consultant in a new market announcement,…

Transformation of Montjuïc’s exhibition grounds gets under way | Info Barcelona

July 29, 2026

Ministry refutes CWM lab shutdown speculations – FBC News

July 29, 2026

Fiji conjoined twins prepare for complex surgery in Saudi Arabia

July 29, 2026

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

Facebook X (Twitter) Instagram Pinterest
  • Contact Us
  • About Us
  • Privacy Policy
  • Terms & Conditions
  • Disclaimer
© 2026 ThemeSphere. Designed by ThemeSphere.

Type above and press Enter to search. Press Esc to cancel.